CCTV PoE budget · Buyer guide

A CCTV PoE budget should reflect camera operating modes and the switch power available under the proposed design. A camera installation can look healthy during a daytime demonstration and have a different power demand when supported night features operate. Before ordering a switch, compare the actual cameras and power configuration. Port count is a useful inventory number; it is not a complete PoE capacity plan.

Cisco Catalyst 9200 Series product-family photograph
Cisco Catalyst 9200 Series product-family photograph. Product reference; not a RIAM installation photograph. Image source.

CCTV PoE budget: check camera demand

Axis distinguishes typical and maximum power scenarios. Depending on the model, maximum demand can include supported heaters, motors and infrared illumination; its guidance also says to account for cable losses when selecting the power source. Axis: typical and maximum camera power consumption

Ask for the exact camera SKU, enabled accessories, required power method and maximum-condition reference. The installed camera may negotiate or reserve power differently from its momentary consumption. Have the designer state how the switch-side allowance was established rather than silently treating device watts and source watts as the same thing.

Read the switch configuration line

Cisco’s Catalyst 9200 data sheet lists PoE availability by switch model and supply configuration, demonstrating why the family name alone does not define the power pool. Cisco: Catalyst 9200 Series data sheet

Your comparison should show the exact chassis, supplies and per-port capability, the available shared budget and any priority policy. Check each port as well as the aggregate. A large total budget cannot make an incompatible individual port power a camera that needs a different supported power type.

Source-side power worksheet — illustrative: Camera maximum condition — SKU, IR, heater and accessories; Source allowance — Include method and cable-loss basis; Port check — Required supported PoE type; Shared pool — Sum all planned allocations; Degraded condition — Surviving supply and priorities; Acceptance — Observe devices under agreed load
Original RIAM editorial planning diagram. Illustrative; use the worksheet below for decisions and evidence. Open full-size diagram.

Calculate an explicit planning example

For illustration only, assume the engineer has already established source-side allowances of 18 W for each of 12 cameras and 35 W for each of four additional devices. The demand is 12 × 18 + 4 × 35 = 356 W. Against a hypothetical available budget of 370 W, only 14 W remains. This is arithmetic, not a recommendation for those camera or switch models.

Now check the required degraded condition. If a failed supply changes the available budget, compare 356 W with that surviving budget too. Do not call the installation redundant merely because two supplies appear on the order. The required devices, priorities and restoration behaviour need an agreed design.

Make the acceptance demonstration meaningful

Require an agreed test with the selected devices and relevant supported features, recording allocations, events and device operation. Test only through an authorised method and window. Decide how future cameras will be admitted so spare ports are not confused with spare power.

Share the camera schedule, distances, accessories and backup-power requirement when asking RIAM about network infrastructure for CCTV. Keep recording/storage performance outside the power calculation unless separately scoped. A good brief makes those dependencies visible before the hardware is delivered.

Source-side power worksheet — illustrative

Use this worksheet in the supplier discussion. Replace example entries with your project information; it is not a completed survey or approved design.

GroupCalculationPlanned allowance
12 example cameras12 × 18 W source-side allowance216 W
4 example devices4 × 35 W source-side allowance140 W
Total / hypothetical 370 W pool356 W / 370 W14 W remaining
Surviving supply condition356 W versus verified surviving poolDesigner must assess separately

Questions buyers ask

Can I multiply typical watts by camera count?

Use the design basis appropriate to the selected camera and operating conditions, including relevant maximum demand and source losses.

Are free ports spare power capacity?

Not necessarily. Check the remaining shared budget and each port’s supported power type.

Does a second supply guarantee redundancy?

No. Verify the budget and required device behaviour when one supply is unavailable.

Are the worksheet watts real product specifications?

No. They are labelled illustrative source-side allowances to explain the calculation.

Does PoE sizing also prove recording performance?

No. Recording bandwidth, storage and application behaviour need their own acceptance scope.

Discuss your requirements with RIAM’s cctv team, or send a project brief. Scope, availability and commercial terms are confirmed in the project proposal.

Manufacturer references

Research checked 24 October 2026. Use the exact selected model, release and applicable project documents.

#RIAM #PowerOverEthernet #CctvNetworking #PowerBudgeting